Also known as Multiplate or ViaPlate
MP200 is a corrugated steel structure widely used to construct bridges, culverts and grade separations. It is lightweight and easy to transport, with the installation possible in any weather within a couple of weeks. It is also a durable and green solution as the steel is completely reusable and can last for 100+ years without special maintenance.
Civil Engineer
+90 5354572512
taygun.altan@viacon.com.tr
Regional Manager
+90 5380848185
erdem.altuntas@viacon.com.tr
The steel is protected against corrosion by hot dip galvanizing. It ensures a steady service life of over 100 years.
These professionally installed structures do not require particular care. Most of the maintenance consists surface renovation of corrosion protection layer – once every 20-30 years.
One crane, assembly branches and a ladder is basically all you need to set up MP200. A team of one specialized supervisor and regular workers will suffice. The installation is so swift that a bridge of 90×12 m can be ready in just 2 weeks.
Severe weather conditions is not a problem for these structures. Suitable for both -50°C and +50°C, MP200 can be installed in the far north of Norway as well as in scorching Morocco.
What guarantees MP200 longevity is our customized corrosion protection system. From the urban landscape to the seawater, we design it for all corrosivity classes. Together with the high-strength steel a simple construction, it makes MP200 a durable solution.
Steel is 100% recyclable. It is lightweight and much faster to produce than concrete. That is why it does not drain natural resources and leaves a much smaller carbon footprint. Finally, the quick assembly results in minimal environmental disturbance.
Span: over 12 m
Load capacity: can withstand any live load classes
Corrugation profile: 200×55 mm
Steel grade: from 235 MPa (Re)
Material: hot dip galvanized steel
Painting system/corrosion protection: accurate, depends on the class of the environment aggressiveness
Available shapes: arch, round, elliptical, box– both closed and open
Certification: CE Certificate of Factory Production Control No. 1023-CPR-0640F, BBA
Bridges
Culverts
Grade separations
Road or rail overpasses
Stockpile conveyor tunnels
Portals
Others
Error: Contact form not found.
Have an idea or a project, lets collaborate!
ViaCon constructs connections. Consciously.
We combine more than three decades of experience with today's cutting-edge technology and vital sustainable goals. ViaCon is a pioneer in the field of Bridges & Culverts-, GeoTechnical- and StormWater Solutions.
Aydınevler Mah.
Aslanbey Cad.
Mert Plaza Sitesi A Blok No: 1-3 İç Kapı No: 23
Maltepe / İstanbul